Dock slot calculator

An empty dock costs almost the same as a busy one. This works out whether a discounted job still beats leaving the slot empty — and which work groups stop paying at the discount you offer. Enter your own figures.

Download

1 · Your figures

Fixed cost per day is what the facility costs whether or not a ship is in it: crew on payroll, dock and lift upkeep, insurance, depreciation, admin. If you know it per month, use the helper.

This page runs entirely in your browser. What you type is saved on this device only — so a refresh does not lose your figures — and never reaches any server: no upload, no email, no analytics. Save the file and it works with no connection at all.

2 · Work groups

Shares default to the structure of 71 real docking invoices — a starting point, not your numbers; overwrite them. Variable cost is the part of the group's list price that you actually pay out when the work happens: materials, consumables, subcontractors, hired labour. If your own crew is paid whether or not this ship comes in, leave their wages out — that is the whole point of the calculation.

Work group Share of bill % Discount % No discount Variable cost % of list At list After discount Variable cost Contribution Max discount %

3 · Result

Revenue after discount
Variable cost
Contribution
Fixed cost of those days
After fixed cost
Enter your figuresThe verdict appears once the job value and the variable-cost shares are filled in.

4 · What different discounts do

The discount below is applied to every group except the ones marked “no discount”. Contribution is what the job leaves after the money you pay out; the last column subtracts the fixed cost of the days it occupies.

Discount Revenue Contribution After fixed cost

5 · Where the candidates come from

The calculator prices a job. It does not find one. This is the part that does — a search anyone in the commercial office can run in about twenty minutes, on a free public portal, with no account and no subscription.

  1. Open the Mediterranean MoU inspection database: portal.emsa.europa.eu/web/thetis-med/inspections. No login. Türkiye is a port state there, so inspections in Turkish ports are in it. For North-European ports the Paris MoU database (THETIS) works the same way.
  2. Set the period to the last twelve months. The form takes at most three years per query.
  3. Set the port state to Türkiye — or to the ports whose traffic passes your dock.
  4. Set the deficiency area to Structural conditions. Run it, then run it again for Water/weathertight conditions. Those two families point at hull work; most of the other thirty-odd point at paperwork, drills and equipment.
  5. Narrow by ship type, gross tonnage and age until what is left is what your dock actually takes.
  6. Open a record and read its Details pane: every statutory certificate with its expiry date, and the date and place of the last survey. From those two you can place the next docking window yourself — class runs a five-year cycle, with bottom surveys no more than 36 months apart.
  7. What you have then, per hull: the fault an inspector wrote down, the owner and the manager, and the window in which the ship has to be in somebody's dock. Take that job to the calculator above and decide what you can afford to quote.

For a sense of the volume — Turkish ports, the twelve months to 25 August 2026, structural plus water/weathertight deficiencies: 921 inspections, 819 distinct ships, 226 of them detained. We ran that query once, to see whether the method was worth writing down. We did not keep the list.

What this is not

A deficiency is not an order. A port-state remark on structure is not a booking for a dock. Part of that work is done afloat, and a ship inspected in Mersin may well dock in Tuzla or Aliağa. Public data shows need, not intent.

So nobody can promise you these customers. Not on this basis, and we do not. What can honestly be said is narrower and more useful: here is where to look, and here is how to count what you find.

And the list stays yours. The portal's terms state that no part of the information may be stored in a retrieval system or transmitted in any form without prior written authorisation from the data owners. So we do not export it, do not keep it and hand no one a ready-made list — the search runs on your screen. This page carries no vessel data at all.

Next step

This is one reading, taken by hand today. The same count can run by itself on a project you have on the floor now: the documents your yard already produces go to one place, and every week the count comes back — leak by package, forecast to completion — without anyone stopping to take a measurement.

How that works →